How to estimate steam demand in a food factory

Before choosing a boiler for a steam cabinet, a jacketed mixing kettle or a pressure cooker, work out how much steam each machine needs and when those demands overlap.

Record the demand of each machine

Ask suppliers for steam consumption in kg/h and the required inlet pressure. Where available, record separate figures for warm-up and normal operation. Kettle capacity in litres describes batch size and does not give a steam flow rate.

For an existing line, use available steam flow records to check how demand changes through a shift. If records are unavailable, use supplier data or ask your engineer for an estimate.

Add up equipment that runs at the same time

Mark when each machine starts, warms up and runs on a production schedule. Compare the totals across time slots to find the highest overlapping demand.

This is a hypothetical food factory scenario. IVEX chose the batch size, temperatures and heat-up time for illustration. They are not measured results or manufacturer specifications.

Worked example: heating a batch of soup
Input or resultValue
Soup per batch100 kg
Start and target temperatures25 °C to 90 °C
Assumed heat-up time30 minutes
Equivalent average steam flow for heating the soup onlyAbout 26 kg/h

Using water as a proxy for a water-based soup, the heat required is 100 kg × 4.19 kJ/(kg·°C) × 65 °C = 27,235 kJ. Assuming dry saturated steam at 3 bar(g) for the calculation, each kilogram releases about 2,133 kJ when it condenses. That gives about 12.8 kg of steam per batch, or 25.5 kg/h on average over 30 minutes.

This estimate covers the soup only. For equipment and boiler selection, also account for heating the kettle, distribution losses and concurrent demand from the steam cabinet and pressure cooker. Confirm equipment inlet pressures and use supplier data or site measurements to establish the peak.

What to prepare before selecting a boiler

  • Equipment list: model, number of units and required steam pressure at the inlet.
  • Batch plan: product, batch size, heat-up time and which machines run together.
  • Steam use: supplier figures or measured flow for warm-up and normal operation, if available.
  • Site information: existing steam piping, fuel and space available, and any planned expansion.
View food processing equipment

Technical reference: Spirax Sarco’s guide to estimating steam consumption

Property reference: Spirax Sarco water specific heat and saturated-steam tables